par kaladmin | Sep 28, 2017 | Non classé
[vc_row][vc_column][vc_column_text]Construction of two detached houses at Rive de Gier[/vc_column_text][vc_column_text]
The construction is located in the middle of a subdivision. The location of houses is optimized by the orientation and the view unobstructed nevertheless an access a bit meandering. The whole construction is consistent with its immediate environment.
End of works: January 2010.[/vc_column_text][vc_separator style=”shadow” border_width=”2″][/vc_column][/vc_row]
par kaladmin | Sep 28, 2017 | Non classé
[vc_row][vc_column][vc_column_text]Arrangement of a veterinary clinic hall in Savigneux (near by town of Montbrison)[/vc_column_text][vc_column_text]In this project, CRISTAL A.B. is an interior designer, completing the project conceived and realized by the Architect Philippe BLANC.
The mission of CRISTAL A.B. is to conceive the space of the hall, to fit out it with the furniture and a customized lifeline specifically conceived and realized for this veterinary clinic. All the ground and walls covers are selected by our care as well as the study of the lighting effects of the entrance. The photo-catalytic paint neutralizes the smell and is specially adapted for the hall flooded with light.
Thanks to the CRISTAL A.B. intervention, the toilet block in the hall was able to benefit of the natural light and participates to the space of the hall by its volumetric integration and its indirect lighting.
The contribution of an interior designer is to personalize every internal space and to create an identity. Functionality combined with beauty.
End of works : September 2009.[/vc_column_text][vc_separator style=”shadow” border_width=”2″][/vc_column][/vc_row]
par kaladmin | Sep 28, 2017 | Non classé
[vc_row][vc_column][vc_column_text]Renovating a house in Saint Victor sur Loire :[/vc_column_text][vc_column_text]A heavy renovation, only keeping the two walls of gears, including an adjoining one
A heavy renovation, only keeping the two walls of gears, including an adjoining one. The technical constraints are numerous: lack of waterproof quality in the basement, party wall, and of cause the protected site’s specifications must be respected. The living arears are now much more specious and meet the current stands of comfort.
End of works: March 2012.[/vc_column_text][vc_separator style=”shadow” border_width=”2″][/vc_column][/vc_row]
par kaladmin | Sep 28, 2017 | Non classé
[vc_row][vc_column][vc_column_text]Processing of a hangar in store with warehouse at Saint Joseph :[/vc_column_text][vc_column_text]
The hangar in poor state along the main urban axis is transformed into equipment and spare parts for heating store. The openings are enlarged to give more brightness to the surface receiving the customers. From the road the sign is more readable through a transparent window.
The store is heated by the ground in low temperature to reflect the concern for saving energy required by the company.
End of works : January 2008.[/vc_column_text][vc_separator style=”shadow” border_width=”2″][/vc_column][/vc_row]
par kaladmin | Sep 28, 2017 | Non classé
[vc_row][vc_column][vc_column_text]Processing Laboratory in charcuterie to Champagne in Ardeche :[/vc_column_text][vc_column_text]
Construction of an industrial building in metal cladding with a surface area of 130 square meters of SHON and 76 square meters of indoor parking.
To conceal the building in the landscape, insulated metal panels on the front windows and metal are creamy white color and vertical metal cladding which crowns the roof light green. The buildings industrial neighbors use the same colors.
End of work: November 2006.[/vc_column_text][vc_separator style=”shadow” border_width=”2″][/vc_column][/vc_row]